S.D.D.T.
Ltd
July – September
No.23
NEWSLETTER
[D8110] 20110
The loco has been
sharing the evening trains with 118 and the Class 37. One day in the second
week of August the loco had to stand in on the service train as steam loco 1420
broke one of its main springs. It would seem that a brake relay valve under the
started to play up as it exhausted air when it shouldn’t. A good thump with a
large piece of metal soon stopped the blow. A reconditioned valve has now been
fitted
A
[D8118] 20118
The loco started off
the season of evening trains on Monday 18th July. The loco has
suffered a fuel leak on one of the high-pressure steel pipes on a cylinder
head; this was repaired after a few days. The loco had a clean up before
working a driver experience turn on Sunday 25th September.
[D7612, 25262] 25901
The tool that
compresses the piston rings when the pistons are lowered back in to the
cylinder liners arrived on site in July thanks to the 71A group for loading
this piece of equipment. It is hope that we can hold on to this until the 33,
has had the same treatment. A small set back occurred when a replacement piston
(Ex class 47) for No.5 liner was having its gudgeon pin removed. It was bigger
than the one from the original piston (we now have two class 47 pistons for
sale!). So the spare power unit (ex 26032) has giving up one of its pistons to
get things moving again. The valves have had their faces re-ground by a firm in
Plymouth. Which means a start on grinding the valve seats in the cylinder heads
has now begun and by the end of September three heads had been done, ready for
the springs to be re-assembled then painting.
[D6501] 33002
The tidying up of the body has made progress
with the body sides now in primer. The roof grills have been removed on both
sides. These can now be cleaned and repaired as required along with the slats,
which the grills cover. At the end of July the No. 1 cab had an all-new metal
front. The floor panels in this cab have all been taken up and it looks good
underneath with only cleaning then a coating of wax oil needed. All below the
sole bar has been de-greased with the steam cleaner. The alloy strips along the
top of the body side have been removed, as they were somewhat bent plus they
were hiding a bit of a mess. These are now being replaced with new strips, but
some bit had to wait until some new steel was welded around the certain areas
were the alloy strips are fitted. By the end of September both sides were
finished with the station being the last side. A class 33, an engineless shell
has come our way for spares. We have paid the road transport cost to get the
loco to Kingsbury, Birmingham, but a last minute hitch came to light as the
transport was on it’s way to Scotland. It would seem a bill by the owner has
not been paid, so we will have to wait to see what the out come is? We needed
to raise £3000 for this to happen and in a matter of days after the call went
out we had half of the above amount. Many thanks to all those that replied
promptly.
Still
working around the station at Buckfastleigh.
Class
09
Not been
started for a while. It is thought a battery fault may have occurred. The
overhaul of this loco gets nearer as each year passes, re the driver
experiences days. This year the day courses have been well attended with only
two classes of loco to choose from. Next year should see the class 25 back to
give more of a choice. So if anyone knows of anyone that may be interested
please pass on this phone number 0845 345 1420 or e-mail experience@southdevonrailway.org.
If each day next year is full then the more money will go towards the overhaul.
Class
37
Has done
a couple of weeks on the evening trains to help crews to refresh/learn the
loco. It has also been named “Loch Treig”.
Class
50
Waiting
at Buckfastleigh for some body repairs to start.
Class
122
By the
end of August the brake van end cab was ready for the gauges & switch
panels to be re-connected up. This was done by mid September, making the cab
look more like it should be. The large saloon is still having the wooden trim
fitted. A slow and fiddly job!
Class
127
Ran for
the owning group towards the start of July, but ended up on two engines. After
a six or seven week spell stabled at Staverton it was returned to Buckfastleigh
on Wednesday 14th Sept (on one engine) ready for a spin at the
transport weekend. Been dragged by 20118 for the driver experience on 25th
Sept.
Yorkshire
In
service up till a spring broke on the middle axle.
Fowler
No change
from last time. Under cover in the P.L.O.G. shed.
Ruston
The loco
now stabled out side by the P.L.O.G. shed has had some work done on the
carburettor of the donkey engine, but for some reason the engine will not
start. This engine is started to make air pressure to start the main engine as
there are no batteries or starter motor on the loco.
Stock
MINK W104700 – No change.
CCT W94556 – No change.
CCT M94852 – No change.
SHOCK VAN – No change.
MINK ‘B’ W125814 (B753100) – No change.
DATES FOR THE DIARY (Diesels
running)
November 5th & 6th – In house
diesel gala.
WORKING WEEKENDS
Are mostly on Sundays at the moment. If you turn up about
between 09.00 and 09.30 someone
should be about !
RUNNING DAYS
Last running Sunday 2nd October.
DAYS
GONE BY
20013 & 170 Passing around Tinsley yard on 17-6-78 with a special railtour. 013 Was broken up at M.C. Metals of Glasgow on 29-9-93 and 170 was broken a few days earlier at M.C. Metals on 12-9-93.
25034
Ex-works with 26010 wait at Pert with a Dundee to Glasgow train on 13-6-78.
25034 was given the name “ABERYSTWYTH CASTLE” for it’s last year so in
service. It ended up on the “pyramid” at V. Berry yard in Leicester and was cut
up 4-3-88. 26010 has ended up in preservation. Now the first loco at the
Waverley route Railway between Carlisle and Edinburgh. (Both R.Coles)
33010 Passing the siding at Newcourt on the Exmouth branch near Topsham on 18-3-86. The loco was withdrawn a year later with severe electrical faults and was cut up on site at Eastleigh works after the body was grounded by V. Berry in February 1989.
Bogie cleaning under way and white glove man removing the old screws that held the floor down in No.1 cab.
Run to the sun next year? The new alloy strips on the riverside of the loco.
55000 Cab the brake van end coming together. 37037 After the naming it wait to work the 15.00 to Totnes.
Buckfasleigh in the early years. 03
& 14XX.